Expert Directory

 

Having an expert witness or consultant at your side can help you navigate complex situations with confidence. These professionals understand your industry and excel at conveying crucial information, whether in a courtroom or a consulting environment. At Intellex, we have experts in over 30,000 areas in our database. We enable you to partner with an individual who has the knowledge, educational background, and relevant experience to support your needs effectively.

Utilize our expert finder tool to handpick the ideal mentor or consultant for your specific application.

ID: 734610 Pennsylvania, USA

Conveyors & Conveyor Systems: design, build & install

Industrial Engineer with a B.S. degree in Industrial Engineering from New Jersey Institute of Technology (class of 1972), a New Jersey Professional Engineer’s license (Mechanical Engineering issued November 19, 1981) (now retired) and has over 45 years of professional experience.…

ID: 733836 Colorado, USA

Environmental and Spatial Statistics, Especially Site Assessment and Remediation

Expert is a statistician with many years of experience in environmental statistics, especially related to site characterization and remediation. He has developed numerous environmental sampling designs for field projects and experimental designs for studies and has analyzed and reported the…

ID: 733542 United Kingdom

Oil and Gas; The Petrochemical Industry

Expert has over 25 years’ extensive experience as a leader in: PMC/EPC FEED-Construction, Maintenance, Risk Management R&D, Commissioning, Design Engineering (Technical) Engineering Civil (ICE) and all facets of Petrochemical/Gas/Wind (GSCS) Project/Contract Management Engineering. This experience spans the United Kingdom, the…

ID: 733143 Texas, USA

Pipelines and Facilities Engineering (Upstream and Midstream)

- Background includes +15 yrs. project management, pipelines and facilities engineering with upstream and midstream experience (conventional developments as well as unconventional shale plays) in both gas/liquids process facilities, and pipeline systems both gathering and transmission, project delivery performance metrics,…

ID: 733090 Florida, USA

Dragline, Phosphate, Pumps, Open Pit mines

Expert has spent over a decade working in a variety of dragline operations, including limestone, phosphate and coal mining. Though each of these operations employs draglines as the main excavating tool, the application and usage of the dragline varies.

ID: 733078 District of Columbia, USA

Climate Change Mitigation, Renewable Energy, and Materials Science

Expert is an internationally experienced science advisor and program manager with over 10 years of experience advancing renewable energy technology development, low emission development, climate change mitigation programs, and materials science research. Expert has provided both field-based and virtual technical…

ID: 732023 California, USA

Healthcare Industry: Ecosystems and Data

Expert brings over 20 years of healthcare industry experience encompassing acute care hospitals, ambulatory centers, health plans, and physician groups in the clinical, operational, financial, and technological realms of the continuum of care. Inasmuch, She has demonstrated the importance of…

Dev Tool:

Request: experts/engineering-change-order/about:blank/page/3
Matched Rewrite Rule: ^experts\/([^\/]*)\/?([^\/]*)\/?page\/([0-9]{1,})\/?
Matched Rewrite Query: pagename=experts&searchKeyword=engineering-change-order&searchDiscipline=about%3Ablank&paged=3
Loaded Template: page-experts.php