Expert Directory

 

Having an expert witness or consultant at your side can help you navigate complex situations with confidence. These professionals understand your industry and excel at conveying crucial information, whether in a courtroom or a consulting environment. At Intellex, we have experts in over 30,000 areas in our database. We enable you to partner with an individual who has the knowledge, educational background, and relevant experience to support your needs effectively.

Utilize our expert finder tool to handpick the ideal mentor or consultant for your specific application.

ID: 731025 California, USA

Construction, Construction Management and Civil Engineering, Safety

30 years industry experience as General Contractor and Real Estate Developer and last 21 years as Expert and Director of the Construction Engineering and Management Program at the Employer.

ID: 730997 Massachusetts, USA

Heavy Marine and Waterfront Construction; Dredging; Civil Engineering; and Claims and Litigation Support

Expert has over 35 years of experience with construction projects as a consulting engineer, elected official, professional society leader, construction engineer, and project manager. He is Ports & Harbors Practice Leader for a national engineering firm and is engaged in…

ID: 730726 Virginia, USA

Government Contracts, Claims, Procurement, and Construction Means and Methods

Expert's expertise stems from twenty years in the Corps of Engineers managing projects from $250K to over $600M overseas and domestically on offices, cantonement areas, major bases and major infrastructure projects. He spent ten years researching and teaching all aspects…

ID: 730644 Canada

Bulk Solids and Material Handling, Plant Design, Site Master-Planning and Project Management

Expert holds two patents for Powder Handling System; he invented a new instrument for measuring solids flow rate using a vision system with great accuracy. Expert draws upon 22 years of solid experience in powder and bulk solids handling where…

ID: 730540 Virginia, USA

Product Development

As Product Development Manager at Altria, expert led a product development group as well as integrated project teams, and successfully collaborated with Brand Management and Consumer Research groups to translate creative ideas into marketable product designs. The team, led by…

ID: 730252 Missouri, USA

Water Utility Construction, Operations and Maintenance, General Construction Management

Design engineer, operations and maintenance manager, and VP a for large private water utility for 25 years. Designed, and operated treatment facilities, distribution facilities (piping, tanks, pump stations). Jobs included corrosion elimination in tanks and pipelines, back-flow prevention rules, cavitation…

ID: 730081 Jordan

Electronic Warfare, Project Management (PMP), Electrical Design

Expert has Electronic warfare systems experience (super heterodyne receivers, IFM and channelized receivers, jamming system, etc.) Expert has Radar and communication signal analysis experience: Simple and complex (agility) radar parameter analysis (frequency, pulse width, pulse repetition interval). Wide range of…

ID: 730045 United Kingdom

Security System Design, Vulnerability & Threat Analysis, Critical National Infrastructure Protection

Expert is one of three directors who form a specialist security technology consultancy practice with in-depth and wide-ranging experience in designing and deploying security technology solutions. His consultancy provides effective technical advice based on the understanding of security threats, the…

ID: 729830 Canada

Energy and Sustainability Project Managment

Expert is an energy and sustainability project management specialist with a background in building science and energy engineering, acknowledged for well-defined understanding of the sustainability (green building) integration in design build projects and leading multi-disciplinary project teams for large infrastructure…

ID: 729648 Connecticut, USA

Managing the Interface Between Owners and Engineering Contractors

Expert has successfully directed engineering and construction projects with values up to $700 million, primarily in the U.S. Working directly for the Owner, he most recently completed a $200 million project, 5% under budget and 2 months ahead of schedule,…

Dev Tool:

Request: experts/construction-schedule/page/8
Matched Rewrite Rule: ^experts\/([^\/]*)\/?([^\/]*)\/?page\/([0-9]{1,})\/?
Matched Rewrite Query: pagename=experts&searchKeyword=construction-schedule&searchDiscipline=&paged=8
Loaded Template: page-experts.php