Expert Details
Total Turnaround Management, RCM, Precom & Commissioning, Bolting, Chemical decontamination
ID: 722669
Australia
Start-Ups Shutdowns, Handling Emergencies, and Fire Fighting and Normal Operations & Maintenance of Continuous Process Industries.
He performed Decontamination of HF alkylation unit for Samref (Saudi Aramco Mobile refinery) for shut down plant maintenance.
He performed De contamination of the columns and vessels in Saudi Chevron Phillips during shut down Feb 2007, October 2007 reduces the gas freeing and release for maintenance 50% less time.
He performed Pre commissioning works for Saudi Aramco GOSP 1 & 2, Qatif Producing Facilities. As a Contractor for Pre Commissioning to Snamprogetti S. p. A. Milanese, Italy. and for Arabian CB & I.
Planning and Work Package Preparation in Progress and the Pre commissioning work.
Prepared Checklist & Forms for Precommissioning and Site acceptance and inspection for startup.
The GOSP 1 consist of Gas Oil Separation Plant, Water Oil Separation Plant, Water Injection Plant, Gas Gathering Plant and Utilities.
Plant Operation Experience:
Prefractionation Separation of C10 – C13 from S. K. Units.
Hydrodesulfurization units.
Molecular Extraction – Molex with continuous operation by having a Rotary Valve System of UOP process.
Platformer Paraffin – Olefin Convertion – Pacol.
Detergent Alkylation system with catalyst of HF Acid.
Hot Oil Circulation System – Balanced draft Oil fired multipass heater using Therm 600 as heating media with a heat load of 40 million Kcal/hr.
LPG Bulk handling and Bottling Plant.
Lube Oil Blending and Manufacturing Plant.
Steam generation, Demineralising unit, Cooling Tower and Effluent treatment system with API oil separation system.
Product handling and storage.
Array
Education
Year | Degree | Subject | Institution |
---|---|---|---|
Year: 1991 | Degree: Post Graduate Diploma | Subject: Petrochemical Engineering | Institution: Central Institute Of Management |
Year: 1986 | Degree: Diploma | Subject: Chemical Technology | Institution: Board Of Technical Education |
Year: 2006 | Degree: B Tech | Subject: Chemical Engineering | Institution: Sri Raghavendra Research Institute |
Work History
Years | Employer | Title | Department |
---|---|---|---|
Years: 2008 to Present | Employer: Undisclosed | Title: Project Manager | Department: Technical Services |
Responsibilities:Presently assigned as Project Manager in Barrup Fertilizers Pty Ltd, operating the largest Ammonia plant in Australia for a Major shutdown planned during July 2008 |
|||
Years | Employer | Title | Department |
Years: 2003 to 2008 | Employer: Mohammad Al Mojil Group | Title: Manager | Department: Technical Services |
Responsibilities:He is responsible for preparation of Bid Packages, Work Packages, Operation manuals and Procedures, Estimation, Project Planning and provide Technical support for the Services Division which perform Maintenance, precommissioning works for Oil and Gas Industries in the Middle East. |
|||
Years | Employer | Title | Department |
Years: 1998 to 2003 | Employer: R R Dyechem | Title: Manager | Department: Production |
Responsibilities:He is responsible for Regular Inspection, Operation of the Plant, Collecting Data, Inspecting for Abnormalities and Planning Schedule for Preventive Maintenance and ATA, Handover the Equipments for Maintenance and Lining Up after Maintenance and Ensuring Safety at all times for the Lube Oil Plant located at Chennai India. |
|||
Years | Employer | Title | Department |
Years: 1995 to 1998 | Employer: Feena Petroproducts Ltd | Title: Supervisor | Department: Production |
Responsibilities:He is responsible for Operation, Maintenance, and Commissioning of LPG Storage and Bottling Facilities |
|||
Years | Employer | Title | Department |
Years: 1986 to 1995 | Employer: Tamil Nadu Petroproducts Ltd | Title: Engineer | Department: Operation |
Responsibilities:He is responsible for Regular Inspection, Operation of the Plant, Collecting Data, Inspecting for Abnormalities and Planning Schedule for Preventive Maintenance and ATA, Handover the Equipments for Maintenance and Lining Up after Maintenance and Ensuring Safety at all times for the large Petrochemical complex located at Chennai India.Precommissioning and Commissioning of Large petrochemical complex. |
Fields of Expertise
chemical plant operation, chemical plant start-up, hydrofluoric acid catalyzed alkylation, petroleum processing, precommissioning, chemical decontamination, compressed gas handling, Hazard and Operability study, distillation column, natural gas processing, oil tank, petroleum corrosion, chemical industry emergency shutdown procedure, petrochemical, maintenance planning, materials safety data sheet, liquefied petroleum gas treating, hydrotreating, petroleum engineering, petroleum, petrochemical reactor, petrochemical catalysis, heat exchanger, gas handling, desulfurization