Pumps, Electric Motors and Generators, Field Service, High Alloy, Temperature, and Pressure Control

ID: 725111 Mexico

Request Expert

Expert has been Operations Manager, Engineering Manager and Managing Director with single overall operation responsibility of a factory with 500 workers, where his team made electrical generators, synchrounous and induction specialties as rotary converters 50, 60, 400 Hz. The factory built dynamic Uninterrupted Power Systems with machines with power rating from fractional to 350 kW. Electric Motors from fractional to 5,000 KW.

Expert has been Operations Manager and Managing Director of a factory with 500 workers where we made electrical generators, synchrounous and induction specialties as rotary converters 50, 60, 400 Hz. The factory built machines with power rating from farctional to 350 kW.

In his experience and knowledge, Electric Rotating Machines are equipment that converts mechanical power to electric power and vice versa they operate by the principle of magnetism where when placed close to each other and face to face equal polarity creates repulsive force and when different polarity creates attractive force, polarity is negative or positive i.e. North or South. Magnetic flux is developed by winding a coil around a magnetic material by changing the direction of the electrical power polarity is changed. Electric Rotating Machines have magnets or electro magnets, arranged in a radial symmetrical (three sides in case of three phase machines) disposition and polarity or relative position (stator to rotor) of this magnets changes by the different methods according to the design of the machine.

Following is a list of machines Expert has worked with and understands in some detail -- including participation in design, selection, application, raw materials selection, elaborate the bill of materials, specific drawings for components, establishing manufacturing process, purchasing of materials, purchasing of machinery, installation, commissioning and start up of machinery, manufacture, test and delivery, installation, filed test, commissioning and Start up.
· Small induction three phase motor 30 watts driven by a micro inverter powered on 12 VDC to drive a pump to provide coolant for high power high density current computer electronic chips not convenient to cool by air as it is done in currently on use computers, my participation was on set up a vacuum insolated test for noise and vibration analysis.
· Built standard Open drip proof, totally enclosed and explosion proof NEMA frame sizes from 143 to 445, AC induction motors, 2, 4, and 6 poles, ¾ to 500 HP, 215 to 460 volts.
· Built induction high resistance squirrel cage for low inrush current high inertia motor for centrifuges, rotor cage was die cast in a high magnesium aluminum alloy.
· Built induction motor-generators for smog test dynamometers special shaft, 300 HP, 6 poles, developed a double screw stator lamination armature to avoid axial forces and smoothing operation.
· Built Large WP2, totally enclosed and explosion proof enclosures AC induction motors horizontal for boiler feed pumps, fans, between bearing pumps, multistage pumps, 250, 500, 650, 800, 1500, 2200, 4500 HP 2, 4 and 6, poles, verticals for condensate and Circulation 750 to 2500 HP 2, 4, 6, 8, 12, and 20 poles, 2300, 4160 and 6600 volts, some with special copper alloy squirrel cage for low inrush current antifriction and oil film bearings.
· Built synchronous motors for reciprocating compressors one bearing up to 1500 HP, 6 poles.
· Built synchronous generators one bearing for Gasoline and Diesel Gen sets from 10 KVA to 500 KVA, 2, 4 and 6 poles.
· Built Synchronous frequency converters 400, 60, 50 Hz up to 350 KVA.
· Built DC motors 150 KW to drive pumps in submarines.
· Built extra high efficiency 98.7% motor for offshore fire pumps.
· Set up variable frequency (continuously variation frequency) heat run test for motors and generators up to 1500 HP.
· Built dynamic UPS Uninterrupted Power Supply systems consisting of a rotary unit vertical with an induction motor a synchronous generator and a flywheel all in same shaft, able to keep the unit running to supply power to critical loads until a Diesel Gen-set kicks off (3 to 8 seconds) replacing the power supply to the induction motor. No glitch no failure even in mills o

· Built dynamic UPS Uninterrupted Power Supply systems consisting of a rotary unit vertical with an induction motor a synchronous generator and a flywheel all in same shaft, able to keep the unit running to supply power to critical loads until a Diesel Gen-set kicks off (3 to 8 seconds) replacing the power supply to the induction motor. No glitch no failure even in mills of Hz. Largest unit built was 350 KVA.
· Built high efficiency, high thrust (35,000 pounds), high speed up to 8100 rpm vertical solid shaft induction generators for cryogenic hydraulic turbines in power of 750 to 1450 KW, developed new supplier with a complete technology transference.
Following are several Field Services I have made.
· Gillette, Vanart, J.T.Baker, Mexico City, Installation and Start up of positive displacement pumps in beauty products laboratories, food processing industries and cosmetic, alignment, vibration analysis, proper wiring, switch gears up to 100 HP.
· CFE, (Comision Federal de Electricidad) Carbón II Utility, Piedras Negras, Coahuila, Mexico, Field Service of Boiler Feed pump motors, oil film bearing cage leakage, vibration analysis, balancing, polarization index.
· CFE, Manzanillo, Colima, Mexico, Filed identification of failed insulation putting and lack of insulating varnish repair of failed pressed coil (6,6 kV) 4.5 gW, 4 poles with no stator rewinding.
· CFE, Carbon II, Piedras Negras, Coahuila, Mexico Utility, Circulator pump Motor polarization index, short circuit identification on pressed coils (6.6 kV) 2.5 gW 28 poles, one leg of a coil replaced with new insulation with no rewinding.
· CFE Rosarito Utility vibration Analysis and troubleshoot of 2 kW fan Motor.
· Pemex, Cadereyta Refinery Field troubleshooting of failed upper thrust oil film bearing.
· Pemex, Tula Refinery, Field troubleshooting of failed short circuit rings due to reverse overspeed, redesign to stand up to 8100 rpm.
· Water Authority of Nuevo Leon, Mexico, Sumitomo, Filed Commissioning, Installation and Start up of 30 pump motor strings, 2.5 kW each, for Cuchillo dam to provide water to the city of Monterrey.
· Miami Dade County, Field service and troubleshooting, 6 vertical high thrust pump motors of failed anti reverse rotation ratchet.
· Transportation, installation, commissioning, Start Up of a dynamic, induction-synchronous Uninterrupted Power System 350 KVA.
· BW / IP, M.W.Kellogg, Shell LNG Nigeria NLNG, Costa Mesa, California, Field test bearing inspection before and after test assembly and reassembly.
· Malaysia MLNG Dua, Sarawak, East Malaysia, Field service inspection Customer Training and vibration troubleshooting of two Cryogenic Expanders.
· Byron Jackson Santa Clara Mexico, Test Lab coordination for Domestic and overseas Customer witness testing of over 100 pump motor strings from 250 HP to 5000 HP.
· Kraft Foods Dallas Texas, Field Service vibration troubleshooting of 1000 kW 2 pole centrifugal compressor motor.
· Alaska and Canada pipelines troubleshooting to repair failed RTD’s by thermal shock for extremely low ambient temperatures, new RTD’s were installed without warranty rewinding motor stator (previous practice).

· Gary Steel Works, Gary Pennsylvania, Field diagnostic and troubleshoot by field welding of failed lamination rotor armature 125 GW, 120 Tons reversible DC, motor.
· Ruhstorf, South Western Germany, complete diagnostic of stopped project for manufacturing High Speed, High Vertical Thrust, Induction Generators, plan

Expert has talked with executives in the investor adviser business in order to provide specific answers to questions regarding how the highly engineered pumps and motors market is approached for orders adquisition, how the relationship with Clients, Customers, End Users, Consultors is created and developed. What is the status of backlog, delivery times, prices and market trends.

Education

Year Degree Subject Institution
Year: 1989 Degree: MBA Subject: Business Administration Institution: IPADE
Year: 1997 Degree: BSME Subject: Electrical & Mechanical Engineering Institution: Almeda UNAM
Year: 2006 Degree: Six Sigma Black Belt Subject: Industrial Administration Institution: Villanova University
Year: 1997 Degree: BABA Subject: Business Administration Institution: Texas A&M
Year: 1974 Degree: BSME, BSEE Subject: Mechanical and Electrical Engineering Institution: UNAM

Work History

Years Employer Title Department
Years: 2002 to 2007 Employer: Flowserve Title: Product Manager Expanders Department: Pump Division Applied Technology.
Responsibilities:
Largest provider of high engineered flow solutions; Pumps, Seals, Valves, 80 manufacturing facilities, 15,000 employees, $3,500 million dollars annual revenues.
Recovering of Woodside IV LNG Expanders Project, after two years (2000 –2002) of struggling to meet contract obligations with no success I was rehired (worked for the company 1995 – 2000) in mid 2002.
Manage meetings with customer and commercial and technical representatives of Flowserve in Perth, Western Australia; Etten-Leur, Holland and Ruhstorf, Germany. To set-up the Project recovery New Plan and report system.
Design review with Engineering Changes of turbine, generators, Seals and ancillary equipment to meet original specifications, scratching out all concession request previously issued.
Shoulder to shoulder work over complete manufacturing cycle of listed components from supply chain to commissioning and start up, recovering all possible materials, documents and processes. Supervision of operations in Holland, Great Britain, Germany and Western Australia were personally conducted to ensure performance.
Progress report were issued as required for upper management and for Customer.
After 18 months of hard work and by strong control and detail work we made a late completion of the expanders project with no jeopardy to the LNG (Liquid Natural Gas 5,000 million Project) with total Customer satisfaction.
Reduce estimated looses from 30 million to 2.5 and manage to get new orders for 2004, 2006 for up to $20 million to make overall net profits over$6 million.
Years Employer Title Department
Years: 2000 to 2002 Employer: Marsel Kanan Hit Title: General Manager Department: Manufacturing
Responsibilities:
Ladies Wear apparel largest operation in México, from supply chain to outlet shops and distribution through an owned network distribution system. 30 detail shops, 500 employees, $4 million per year.
Previous to his collaboration the manufacturing of all product was made by subcontracting all sewing with 15 shops (900 headcount) located around México City.
He manage the purchasing of the largest sewing facility built in the 90’s in North America by Burlington to develop an outlet for their fabric as an strategy to compete with low price from Asia and Europe, new Industrial Park was developed (Cuidad de la Confección) with the participation of 8 other apparel manufacturers. After three years of no success and over $15 million dollar investment and without surpassing the break even point the operation was on sale.
He hired up to 300 persons and with up to 10 direct reports and no managers but supervisors He had absolute control of the operation.
In order to set up competitive salaries for sewers he implemented a breakfast and lunch (sold to cost) but with workers cost of more than half of the law’s minimum wedge, savings and cost reduction was implemented in all details from the beginning.
He handle the by-laws, operation rules and complete strategy to work 48 hours per week opposed to 40 to 43 weekly hours worked by all other factories in the Industrial park.
He was single responsible for all operation until operating break even point was reached in less than two years from the date of purchase.
Years Employer Title Department
Years: 2000 to 2000 Employer: Teco-Westinghouse Motor Company Title: Director of Projects Department: Projects
Responsibilities:
Largest electric motor and generator factory in North America AC DC up to 120 MW with weight up to 120 tons
Director of Projects.
He took the leadership of contracts and orders administration with a team of 8 contract managers 170 millions per year, manufacturing was dependant on supplies from Taiwan except when customers requires USA materials, coordination with Taiwan offices was not properly handled and the time zone difference was a large hurdle and getting response by e-mail was normally taking 3 days, He established a system to get response in same day by three phone calls 2:00 am, 5:00 and 9:00 p.m. I improved coordination and late responses were no trouble any more. By close and energetic supervision documentation of orders in the Syteline System was reduced from one month average to three days.
At same time he took the responsibility of warranty and field service most of the situation were left without responding to the customer then leaving strong arguments when claiming order cancellation and refund of payments, wrong installations and wrong designs were cause of claim, by understanding in detail the cause of claim I took actions to fix the problems and obtained the complete satisfaction of the customer. I saved over 5 million dollars in pending claims. Warranty and Service had a team of 6 Engineers.
Years Employer Title Department
Years: 1997 to 2000 Employer: Flowserve (Byron Jackson) Title: Projects and Product Manager. Department: Pump Division, Projects and Product Managment.
Responsibilities:
Same company for 2002-2007 Byron Jackson México City.
Responsible of the Product management research and development, coordination with Clients, Technical Advisors and Vendors, member of the corporate product management group, holing meetings in USA and Europe.
Responsible of Sales Technical Presentations, Contracts administration, document control, expedition, coordination with Vendors and Customers on orders of $25 million per year.
Customer test coordination and witness.
Direct reports five engineers and 25 subordinates total including sections of the test lab.
Years Employer Title Department
Years: 1996 to 1997 Employer: Flowserve Corporation (BW/IP) Title: Project Manager Department: Pump Division, Tulsa Operations
Responsibilities:
Same company for 2002-2007 then BW/IP, Tulsa, Oklahoma.
Project Manager.
Project Manager four Cryogenic expanders with induction generators where the forecast profit of 1.5 million on a sale of 8 million resulted in 3 million by the replacement of the majority of raw materials, processes and vendors.
Project was completed on time with excellent satisfaction of Contractor, basic and detailed Engineering companies, Consultants, Owner and End User.
Years Employer Title Department
Years: 1990 to 1995 Employer: Reliance Electric Title: Managing Director Department: General Direction
Responsibilities:
He was the leader to recover the company from a complete bankruptcy with no resources to a profitable operation in three years. He managed to get back to work the workers and employees due they were not paid for over three paydays they were not working. He managed agreements with vendors and creditors to allow movement margin and let the operation continue. He managed to obtaining additional down payments from customers in order to fulfill orders in backlog.

International Experience

Years Country / Region Summary
Years: 1996 to 1996 Country / Region: Malaysia Summary: He was responsible of the Installation, Commissioning and Start up of Cryogenic LNG and Mixed refrigerant turbo expanders for Malaysia MLNG DUA, job was completed in several trips.
Years: 1995 to 1997 Country / Region: USA/Tulsa Oklahoma Summary: He Developed a very specialized Vertical Induction Generator supplier from south Germany to replace previous vendor. He succeded in completion in time with overall savings to duplicate the profit in the project to provide cryogenic expanders to Nigeria NLNG.
Years: 2002 to 2003 Country / Region: Holland, Etten-Leur. Summary: Recovering of Woodside IV LNG Expanders Project, after two years (2000 –2002) of struggling to meet contract obligations with no success He was rehired (worked for the company 1995 – 2000) in mid 2002.· Manage meetings with customer and commercial and technical representatives of Flowserve in Perth, Western Australia; Etten-Leur, Holland and Ruhstorf, Germany. To set-up the Project recovery New Plan and report system.· Design review with Engineering Changes of turbine, generators, Seals and ancillary equipment to meet original specifications, scratching out all concession request previously issued.· Shoulder to shoulder work over complete manufacturing cycle of listed components from supply chain to commissioning and start up, recovering all possible materials, documents and processes. Supervision of operations in Holland, Great Britain, Germany and Western Australia were personally conducted to ensure performance.· Progress report were issued as required for upper management and for Customer.· After 18 months of hard work and by strong control and detail work we made a late completion of the expanders project with no jeopardy to the LNG (Liquid Natural Gas 5,000 million Project) with total Customer satisfaction.· Reduce estimated looses from 30 million to 2.5 and manage to get new orders for 2004, 2006 for up to $20 million to make overall net profits over$6 million.
Years: 2002 to 2003 Country / Region: Germany, Ruhstorf. Summary: Recovering of Woodside IV LNG Expanders Project, after two years (2000 –2002) of struggling to meet contract obligations with no success I was rehired (worked for the company 1995 – 2000) in mid 2002.· Manage meetings with customer and commercial and technical representatives of Flowserve in Perth, Western Australia; Etten-Leur, Holland and Ruhstorf, Germany. To set-up the Project recovery New Plan and report system.· Design review with Engineering Changes of turbine, generators, Seals and ancillary equipment to meet original specifications, scratching out all concession request previously issued.· Shoulder to shoulder work over complete manufacturing cycle of listed components from supply chain to commissioning and start up, recovering all possible materials, documents and processes. Supervision of operations in Holland, Great Britain, Germany and Western Australia were personally conducted to ensure performance.· Progress report were issued as required for upper management and for Customer.· After 18 months of hard work and by strong control and detail work we made a late completion of the expanders project with no jeopardy to the LNG (Liquid Natural Gas 5,000 million Project) with total Customer satisfaction.· Reduce estimated looses from 30 million to 2.5 and manage to get new orders for 2004, 2006 for up to $20 million to make overall net profits over$6 million.
Years: 2002 to 2004 Country / Region: USA, California. Summary: Recovering of Woodside IV LNG Expanders Project, after two years (2000 –2002) of struggling to meet contract obligations with no success I was rehired (worked for the company 1995 – 2000) in mid 2002.· Manage meetings with customer and commercial and technical representatives of Flowserve in Perth, Western Australia; Etten-Leur, Holland and Ruhstorf, Germany. To set-up the Project recovery New Plan and report system.· Design review with Engineering Changes of turbine, generators, Seals and ancillary equipment to meet original specifications, scratching out all concession request previously issued.· Shoulder to shoulder work over complete manufacturing cycle of listed components from supply chain to commissioning and start up, recovering all possible materials, documents and processes. Supervision of operations in Holland, Great Britain, Germany and Western Australia were personally conducted to ensure performance.· Progress report were issued as required for upper management and for Customer.· After 18 months of hard work and by strong control and detail work we made a late completion of the expanders project with no jeopardy to the LNG (Liquid Natural Gas 5,000 million Project) with total Customer satisfaction.· Reduce estimated looses from 30 million to 2.5 and manage to get new orders for 2004, 2006 for up to $20 million to make overall net profits over$6 million.

Career Accomplishments

Associations / Societies
APICS, AWS, AMIME, ASME.
Professional Appointments
Expert has been a member of public companies' board of directors.

Additional Experience

Expert Witness Experience
Expert has prepared and assisted in the presentation of witness and expert opinion addresses as technical advisor of legal counselors.
Training / Seminars
Magistral Conference on Secondary Techniques of High Alloy Steel Refining, CIATEQ Turbo machinery Conference 1988.
Magistral Conference on High Power, High Speed, High Thrust, Vertical Industion Generation for LNG Base Load Plants cogeneration 1994.
Processes and continuous improvement seminar 2008.
Vendor Selection
Strong experience on locating, resourcing, auditing, certifing, negotiation, follow up, control, inspection, witness testing, of highly engineered special application motors, generators, pumps, hydraulic turbines fro coogeneration.
All concerning chain supply for metal mechanic industries.
Marketing Experience
High Engineered pumps, hydraulic turbines for cogeneration, market practices, trends, main players, technology, research and development, leaders, price setters.
Small, medium and large High Engineered motors and generators, market practices, trends, main players, technology, research and development.
Liquid Natural Gas, Production, Storage, Transportation, Regasification, Regulations, history.
Liquid Gases Industry.
Cryogenic Industry.
Other Relevant Experience
- High pressure Needle, Ball, Gate and, Plug Valves. Blowout Preventors, Oil well heads (Xtmas Trees), off shore submarine and surface drilling and completing equipment.
- Cryogenic Storage Vessels double thermal insulation Vacuum – Perlite, positive displacement pumps, expanders, centrifugal pumps.
- Steel Castings high, medium and carbon alloy from 5 grams to 35 tons unit weight.
- Iron Castings white, nodular, ductile, gray, patterns and patterns manufacturing.
- Welding Tig, Mig, electrode, plasma, bracing, solder, induction, oven, and friction.
- Forging open and close die, up to 15 tons net weight.
- Castings green sand, shell molding, No-bake, Iso-cure, hot and cold box, investment, wax molding, dies and die making, molds and molds making.
- Apparel ladies formal and casual wear manufacture from design to sales, special automated machines for cutting, fusing and sewing.
- Electrical Machines uninterrupted power supplies, motor generator sets with combustion engines, alternating current, direct current, high and controlled frequency. Extremely high-speed, vertical, high thrust, induction generator first ever built for cryogenic expanders.
- Mechanical Design Research and development of mechanisms and devises to automate industrial processes, improvements of designs for better efficiency.

Language Skills

Language Proficiency
French Fluent conversation.
Spanish Fluent
English Fluent

Fields of Expertise

alternating-current generator, alternating-current synchronous generator, asynchronous motor, constant frequency variable speed generator, brush motor, cryogenic bearing, cryogenic seal, cryogenics, direct-current generator, electric motor, electric motor application, electric motor bearing design, electric motor design, electric motor development, electric motor failure, electric motor noise, electric power generation equipment, flywheel, high-alloy steel, induction generator, induction machine, induction motor, lathe, metal fatigue, metal testing, metal weldment fatigue, motor generator, polyphase motor, pumping equipment, rotary electric motor, rotating electric machinery, rotating electrical machinery maintenance, rotating equipment failure testing, rotating generator, rotating machine, rotating machinery, rotating machinery development, rotating machinery failure analysis, rotating machinery reliability, rotating machinery reliability improvement, rotating-beam fatigue testing, rotational runout, self-excited generator, slip ring, total indicated runout, variable-speed generator, product failure, compressor bearing, equipment specific maintenance, oil refinery equipment, bearing temperature, capital equipment, system reliability, machining center, dry lubricant, bronze bearing, load (force), bearing system, alloy hot forging, gear motor, fixed geometry bearing, Babbitted bearing, engine bearing, sintered bronze, bearing wear, engine cooling, continuous casting equipment, ceramic component manufacturing, ceramic component, bronze casting, angular-contact bearing, abrasive blasting equipment, compressor lubrication process, ceramic bearing, bearing reliability, bending, end mill, rotary power, cable fatigue strength, cable terminal, secondary winding, fatigue strength, gunmetal, Babbitt metal, electric-arc furnace, cupola iron melting, instrumentation (equipment), winding coil, electric vehicle motor, lubrication equipment, metal alloy research management, rubber bearing, carbon-graphite bearing, single-point diamond machining, couple balance, materials research management, compressor selection, commercial laundry equipment, management equipment, air-related equipment, alloy corrosion, bushing (shaft lining), bearing selection, permanent-magnet motor, terminal, velocity-type flowmeter, machinery, magnetoelectric generator, flexible roller bearing, impact load, electrical equipment, equipment, power shaft, turbine generator, rubber impact testing, molybdenum alloy, alloy, metallurgy, metal bending, linear electric motor, mechanical journal, heat-resistant alloy, hand generator, flexible shaft, compressor (machine), centrifuge, camshaft, bronze, antifriction bearing, air bearing

Request Expert

Dev Tool:

Request: expert/pumps-electric-motors-and-generators-field-service-high-alloy-temperature-and-pressure-control
Matched Rewrite Rule: expert/([^/]+)(?:/([0-9]+))?/?$
Matched Rewrite Query: experts=pumps-electric-motors-and-generators-field-service-high-alloy-temperature-and-pressure-control&page=
Loaded Template: single-experts.php