Project Management, Major Capital Project Planning Primavera P6, Oil, Gas, Power Generation
ID: 723659
Pennsylvania, USA
EV is the method of choice to control and follow up the cost and time performance of projects. While not a new concept, project managers and companies are now slowly adopting this methodology. He was involved with EV at the beguining of 2001 when he have to manage a $100 million project. Since then he has studied and applied the EV method to several projects, countries and companies, allowing him to draw on hands-on experience in the applicability of EV for following up and controlling projects.
A project without a good planning is as ship without compass on a dark night in the middle of the ocean. There is not sense of direction and of course it will go nowhere.
His expertise in planning dates back to 1980 when he did his MSc at UMIST. At that time, precedence diagram and computers were an incipient mix. Today computers' dramatic increase in processing power allows very sophisticated planning tools such as Primavera and MS Project. Harnessing this power and using it to its fulliest is very important and this is his area of knowledge and expertise. After 28 years in capital projects and hand on experience with major projects, Expert has the experience to provide indepth assistance with all aspects of project and resource planning.
The scope of work or Statement of work (SOW) is the most important document to be produced while implementing a project. In it, the project timeline, standards, specs. and drawing safety, are set. The SOW is the base document to develop the WBS, which will be the foundation stone for the planning, reviewing and assuring that the SOW is complete. It is important to have only what is needed and define deliverables and objectives. This is fundamental to achieve project objectives.
A proper assessing of risk areas and contingency plan to avoid or minimize risk is a FEL area. This brings a large potential savings on time and costs. Risk management considers the possibilitiy of events that could delay project execution. Expert brings his 28 years of experience to the table when helping with risk management.
As part of front end loading, a Constructability exercise must be carried out by a team of experts generally assigned by the client or provided by the consultant. Key areas such as location, soil investigation, weather factors(extreme cold, heat), resources availability,construction method, expertise needed, materials used and risk areas all need to be considered before the actual construction start. Constructability is key to achiving a safe project on time and within budget. Expert has years of experience handling constructability issues.
Bidding Consulting for a Refinery job in MexicoTurnaround advisor in Trinidad Tobago
Education
Year | Degree | Subject | Institution |
---|---|---|---|
Year: 1982 | Degree: MSc | Subject: Mechanical Engineering | Institution: UMIST |
Year: 1978 | Degree: Mechanical Engineer | Subject: Mechanical Engineering | Institution: UCV |
Work History
Years | Employer | Title | Department |
---|---|---|---|
Years: 2004 to Present | Employer: Undisclosed | Title: Senior Project Manager, Planning Consultant | Department: |
Responsibilities:He is the Senior Project Manager and Planning consultant, he also is a founding member of Employer. As such, he is providing consulting services for Capital Project Management and Planning. Also he can do tailored training to companies in Project Management and planning optimization |
|||
Years | Employer | Title | Department |
Years: 2001 to 2003 | Employer: PDVSA | Title: Project Manager | Department: PICC Project |
Responsibilities:He managed the PICC project which was a 100 USD Million project to revamp a FCC/Alky unit for a major refinery |
|||
Years | Employer | Title | Department |
Years: 1998 to 2001 | Employer: PDVSA | Title: Engineering Superintendent | Department: Engineering |
Responsibilities:He was the engineering superintendent at El Palito refinery. He oversaw a diverse capital project portfolio of aprox. 30 million USD per year. Major projects were an electrostatic precipitator to remove solid from flue gases, waste water processing plant, and a gas venting system for the refinery. |
|||
Years | Employer | Title | Department |
Years: 1997 to 1998 | Employer: PDVSA | Title: HSE Manager | Department: HSE |
Responsibilities:He was the HSE Manager with responsability for the contingency paln against major event such as oil spillages, fire and environmental issues. |
|||
Years | Employer | Title | Department |
Years: 1992 to 1997 | Employer: PDVSA | Title: Maintenance Superintendent | Department: Maintenance |
Responsibilities:He was responsible for the maintenance and TA execution for a crude destiller and power generation unit at El Palito Refinery. |
|||
Years | Employer | Title | Department |
Years: 1991 to 1992 | Employer: PDVSA | Title: Power Generation Supervisor | Department: NRO Project |
Responsibilities:He was responsible for the optimal selection of Boilers and power generation equipment for a 600MW power coke/flexigas burning generation unit. He was assigned to Fluor Daniels and United Engineers in the USA |
|||
Years | Employer | Title | Department |
Years: 1988 to 1991 | Employer: PDVSA/ Isla Refinery, Curacao | Title: Maintenance Turnaround Manager | Department: Maintenance Turn Around |
Responsibilities:He was the Maintenance Turnaround manager for a 250KBD refinery. He was responsible for planning, contracting out and controlling TA execution |
|||
Years | Employer | Title | Department |
Years: 1986 to 1988 | Employer: PDVSA/Isla Refinery, Curacao | Title: GUP Project Manger | Department: GUP Project |
Responsibilities:He was the Project manager for a 20 MM USD revamp project for the utilities at the Isla refinery. As part of the project two salt water desalination unit, two steam boilers, air compressor and a GE gas turbine were installed on time and within budget. |
International Experience
Years | Country / Region | Summary |
---|---|---|
Years: 2004 to 2005 | Country / Region: Saudi Arabia | Summary: He was the Project Control Manager for a Major Construction Company in Saudi Arabia |
Years: 1991 to 2003 | Country / Region: Venezuela | Summary: He was the Senior Project manager, Turn around expert and maintenace superintendent for an oil refinery in Venezuela. |
Years: 1991 to 1992 | Country / Region: USA | Summary: He was the Supervisor for a 600MW Power Generation Plant assigned to Fluor Daniels(Texas) and United Engineers(Philadelphia). |
Years: 1986 to 1991 | Country / Region: Curacao | Summary: He was Manager for major capital project and refinery turnarounds. |
Years: 2003 to 2004 | Country / Region: Trinidad and Tobago | Summary: He was a Turnaround advisor to Cudjoe construction. |
Career Accomplishments
Associations / Societies |
---|
Venezuela College of Engineers; ASME Member |
Licenses / Certifications |
---|
MSc Applied Mechanics |
Professional Appointments |
---|
General Manager, Senior Project Manager and Planning consultant Employer |
Publications and Patents Summary |
---|
He has two publications in Local Loads in GRP pipes and one in Montecarlo reliability assessment for determining optimal configuration of boiler in a 600MW power generation unit |
Additional Experience
Expert Witness Experience |
---|
Major Capital Project Management; Project Control; Primavera Project Planning; WBS development; Earned Value Analysis |
Training / Seminars |
---|
A 4-day seminar in Project Management Techniques, Two day seminar in WBS |
Other Relevant Experience |
---|
Predictive/preventive maintenance in refineries |
Language Skills
Language | Proficiency |
---|---|
English | He is proficient in the use of English |
Spanish | Native |
Fields of Expertise
corporate strategic planning, strategic planning, earned-value system, project management, project review, project planning, Microsoft Project Manager, planning, power generation project management, project execution planning, project scheduling, resource planning, proposal writing, risk management, constructability, Primavera P6, project management software, capital planning, project risk management, oil management, construction claim, design to capacity, value improving practice, site definition, operability and maintenance review, front end loading, business management, project assessment, organization redesigning, Lotus Notes, project planning software, project cost engineering, construction accident, construction inspection, project management software selection, petroleum refinery, construction, fluid catalytic cracking, petroleum processing, American Society of Mechanical Engineers