Expert Details
Process Control and PLC/MMI Programming
ID: 725674
Kentucky, USA
·Developed electrical prints, PLC, and MMI programs for new automated assembly equipment
·Upgraded discretely controlled analog drive systems to Allen Bradley 1395 DC and 1336 AC drives utilizing Remote I/O for control. Commissioned PowerFlex 4 AC Drives.
·Extensive experience installing and tuning PLC5 closed loop PID control systems for plant process applications.
·Supplied technical support for electrical control systems including programmable controllers, HMI/MMI, process instrumentation and AC/DC drives.
·Experience with Automation Direct V5, Omron Syswin V3.4, RSLogix 500, Control Logix 5000 and RSLogix 5 PLC programming software.
·Experience with Automation Direct EZ Touch editor, Omron NTST V4.6, PanelBuilder 32 and Component PanelView MMI programming software.
Education
Year | Degree | Subject | Institution |
---|---|---|---|
Year: 1992 | Degree: BS | Subject: Electrical Engineering | Institution: University of Kentucky |
Work History
Years | Employer | Title | Department |
---|---|---|---|
Years: 2002 to Present | Employer: Undisclosed | Title: Electrical Engineer | Department: Assembly |
Responsibilities:Coordinate various departments to develop, assemble and commission new machine designs for automated assembly department |
|||
Years | Employer | Title | Department |
Years: 1998 to 2002 | Employer: Daramic | Title: Process Controls Engineer | Department: Engineering |
Responsibilities:Developed electrical schematics and PLC programming to replace individual discrete controllers with PLC5 and Control Logix 5000 programmable controllers and 1400E/550 Panelview machine interface. |
|||
Years | Employer | Title | Department |
Years: 1994 to 1998 | Employer: Vermont American | Title: Process Engineer | Department: Carbide Grinding. |
Responsibilities:Responsible for department quality and production. |
|||
Years | Employer | Title | Department |
Years: 1992 to 1994 | Employer: Millken & Co | Title: Maintenance Engineer | Department: Maintenance |
Responsibilities:Available upon request. |
International Experience
Years | Country / Region | Summary |
---|---|---|
Years: 2006 to 2006 | Country / Region: China/Guangzhou | Summary: Converted and moved machinery to China plant. |
Additional Experience
Training / Seminars |
---|
PLC MMI program training. |
Marketing Experience |
---|
Work at a VPP manufacturing site. |