Expert Details
Pumps for Wastewater, Building of Pumpstations in PE and Concrete, Pumpstation Accessories
ID: 729396
Denmark
Since 1998 he has worked in the pump business, first as a service manager for ITT Flygt, later from 2003 until 2009 He had his own company with 12 people employed.
His company made primary pump stations in PE both for waste water & grey water. Sometimes the pump stations was made in concrete.
He has also distributetd pumps for sewage water, off shore, industries, contractor pumps.
He has designed all pump station & pump systems and also duing the complete system design.
He designed a complete pump system for 800 households.He designed new PE pump station 3000 x 9500 mm & calculating duty point for pumps.
He renovated a main pump station, and he made emergengy pumping.
He calculated new pressure pipes and energy saving.He made calculations on propeller pumps for a big ship yard and he had made the complete installation of 4 1200 mm discharge pipes. He has designed and produced more than 1000 pump stations.
Education
| Year | Degree | Subject | Institution |
|---|---|---|---|
| Year: 1995 | Degree: Bachelors | Subject: Marine Engineer | Institution: Aarhus School of Marine and Technical Engineering |
| Year: 1988 | Degree: Craftsman | Subject: Locksmith | Institution: Aarhus Oil Company |
Work History
| Years | Employer | Title | Department |
|---|---|---|---|
| Years: 2009 to Present | Employer: Undisclosed | Title: Manager | Department: Water & Wastewater |
Responsibilities:He is responsible for water & wasterwater market in Denmark.He is responsible for production and design of pump stations to the communities in Denmark. |
|||
| Years | Employer | Title | Department |
| Years: 2003 to 2008 | Employer: DPS Pumps | Title: Owner | Department: Water & Wastewater |
Responsibilities:He started DPS pumps, which produced pump stations for waste water in concrete & PE materiel.He designed all pump systems for waste water and grey water. He did consulting jobs for communities. |
|||
| Years | Employer | Title | Department |
| Years: 1997 to 2003 | Employer: ITT Flygt | Title: Service Manager | Department: Service Water & Wastewater |
Responsibilities:He was responisble for installing & making service on pumps & pumpstations for waste water & grey water in DK. |
|||
| Years | Employer | Title | Department |
| Years: 1988 to 1997 | Employer: Chevron | Title: Marine Engineer | Department: International |
Responsibilities:He worked for Chevron in a traning program to become a marine engineer.He succeced in 1995 to become a marine engineer. He worked for Chevron in 2 years as a marine engineer, and 2 years as a mechanist. |
|||
| Years | Employer | Title | Department |
| Years: 1984 to 1988 | Employer: Aarhus Oil | Title: Locksmith | Department: Production |
Responsibilities:He was an apprentice to become a locksmith. |
|||
Additional Experience
| Expert Witness Experience |
|---|
| He is a specialist in designing & production of pump stations for waste water & grey water. He is a specialist for system design for pump stations. He can calculate pump systems for waste water. |
Fields of Expertise
air ejector, centrifugal pump, centrifugal pump application, liquid pumping, pump application, pump capacity, pump evaluation, pump selection, pump testing, pumping application, pumping equipment, pumping system, pumping system design, pumping system troubleshooting, self-priming pump, sewage pump, submersible pump, wastewater pumping equipment, pumping station, pump efficiency, booster pump, energy-efficient pump, axial-flow pump, energy-efficient water pumping, positive-displacement non-rotary pump, ejector pump, water pumping, positive-displacement pump, plunger pump, piston pump, water pump, wastewater transportation equipment, screw pump, pump seal, positive-displacement rotary pump, gear pump, boiler, bilge pump