Expert Details
Oil and Gas Well Expert
ID: 735804
Texas, USA
Rigs Worked:
Deepwater work: SedcoForex Cajun Express 5th Generation DP Semi, built and commissioned for Marathon and drilled one well in 9100' in GOM. Global Santa fee drillship DP (Jack Ryan) drilled in 8500' in Australia. Transocean Marianas drill in 5500' water in GOM for Petrobras. Max Smith drilled in 3900' water GOM for Woodside. Semi's worked on for Noble: Loris Bouzigard, Max Smith, Diamond Ocean America, Ocean Voyager.
Transocean Falcon 100, Celtic Sea, Marianas. Pemex Pegasus in 9,216' water in GOM.
Rowan Resolute in 5,200' water in GOM for Anadarko.
Jack ups: Ensco 75, Todco 152, Diamond Ocean Tower, Gorilla IV. Pride 1501 Platform, Missouri, Florida, Hercules 30, TOI AD9.
Oil base and synthetic based muds. Rotary Steerable Systems, MWD/ LWD- EZ-Pilot, Geo-Pilot, V-Pilot, Nav Track, Cameron and FMC Dual wellheads systems, Drill quip small and big bore.
Education
Year | Degree | Subject | Institution |
---|---|---|---|
Year: | Degree: AA Degree | Subject: | Institution: Santa Fee Community College |
Work History
Years | Employer | Title | Department |
---|---|---|---|
Years: 2018 to Present | Employer: Undisclosed | Title: Drilling Supervisor/ Company Man | Department: Chad, Africa |
Responsibilities:Cardno/ PPI |
|||
Years | Employer | Title | Department |
Years: 2018 to 2018 | Employer: Anadarko Petroleum | Title: Night Consultant/ Company Man | Department: |
Responsibilities:Rowan Resolute |
|||
Years | Employer | Title | Department |
Years: 2015 to 2015 | Employer: Pemex | Title: ALPHA Deepwater Services- Advisor | Department: |
Responsibilities:For Pemex, GOM, Seadrill West Pegasus 6th Generation DP Semi, HTHP Oil Base, Water depth 9216'. |
|||
Years | Employer | Title | Department |
Years: 2014 to 2015 | Employer: PPI/ Cardno | Title: Sr. Day Company Man | Department: |
Responsibilities:Afren in Nigeria, Jack Up AD9 Batch drill surface holes from 7000' to 10,000'. Drilled wells with oil based and polymers muds using brine fluid for completions. Completed all wells with lower and upper completions. Ran Screen, ECP PAC valves and Hanger assembly. Set ZXP Packer. Run ESP GT Packer, ESP Motor/ Seal pump assembly installing cable clamps/ connect ESP cable to top and bottom packer, test P/U Aker tubing hanger and Production string, SCSSV control line and ESP Cable. Land out and test same. |
|||
Years | Employer | Title | Department |
Years: to Present | Employer: Undisclosed | Title: Sr. Day Supervisor | Department: |
Responsibilities:Singapore shipyard refurbishing AD1 Jack up.. |
|||
Years | Employer | Title | Department |
Years: to Present | Employer: Undisclosed | Title: Sr. Supervisor | Department: |
Responsibilities:On Jack up AD9 for Afren in Nigeria. Batch drill wells from 7000' to 10,000'. Drilled wells with oil bae, polymer muds using brine fluid for completions. Completed all wells with lower and upper completions. Run screen, ECP PAC valves and Hanger assembly. Set ZXP Packer, Run ESP GT Packer, ESP motor/ seal pump assembly installing cable clamps/ connect ESP cable to top and bottom Packer and test. P/U Aker tubing hanger, Production string, SCSSV control liner and ESP cable, land out test. |
|||
Years | Employer | Title | Department |
Years: 2012 to 2013 | Employer: Murchison Oil and Gas | Title: Day Drilling Supervisor | Department: |
Responsibilities:Working on land rigs- Super Single series in New Mexico, Permian Basin. Drilling horizontal and multi-lateral wells underbalance with production fluid and nitrogen. Drill and complete 10 wells Ogden State Eddy County. Performed 9 rig moves, order out all equipment for drilling wells, order and oversee cementing operations. Participate with H2S drills and testing of equipment. Observed personnel in compliance with proper PPE while drilling in H2S area. Work with BLM as per policy and regulations. (Contractor HWD Rig 4) Lead and participate in all Safety meeting and pre-tour meeting. |
|||
Years | Employer | Title | Department |
Years: 2011 to 2012 | Employer: HESS | Title: Drilling Supervisor | Department: |
Responsibilities:Work on batch project for Stena Forth Drill Ship. Work out of office. Performed Rigless P&A in GOM. |
|||
Years | Employer | Title | Department |
Years: 2010 to 2011 | Employer: PPI Technology | Title: Drilling Supervisor | Department: |
Responsibilities:Nigeria as a Day Drilling Supervisor on a Jack up AD( for Afren. Drilling mainly horizontal wells 7000' to 10,000'. Positioned MOPU and FSO and are producing oil.Batch drill wells from 7000' to 10,0000'. Drilled wells with oil base, polymer muds using brine fluid for completions. completed all wells with lower and upper completions. Run screen, ECP PAC valves and Hanger assembly, Set ZXP Packer, Run ESP GT Packer, ESP motor/ seal pump assembly installing cable clamps/ connect ESP cable to top and bottom Packer and test. P/U Aker tubing hanger, production string, SCSSV control liner and ESP cable, land out test. Aker Duel Wellheads. |
|||
Years | Employer | Title | Department |
Years: 2009 to 2010 | Employer: Aban Ltd. | Title: Rig Superintendent | Department: |
Responsibilities:Drillship Aban Abraham Pte. Ltd. Offshore West Africa (Ghana/ EG) Drilled two dry holes, lost contract. Upgraded rig in Mobile Bay for Petrobras contract. |
|||
Years | Employer | Title | Department |
Years: 2008 to 2009 | Employer: LLOG | Title: Consultant/ Company Man | Department: |
Responsibilities:Drilled and completed 4 wells with Noble Lorris Bouzigard (Semi) water depths 2600' to 3000'. SMB 12.0 PPG to 15.0 PPG. All directional wells using Baker/ Schlumberger down hole tools. Rotary steerable, Nav Teach, LWD/ MWD, HTHO, GOM. |
|||
Years | Employer | Title | Department |
Years: 2006 to 2008 | Employer: Mariner Energy Inc. | Title: Consultant/ Company Man | Department: |
Responsibilities:Drilled and completed 7 wells with Noble Lorris Bouzigard (Semi) water depths 2500' to 4000'. SBM 12.0 PPG to 15.0 PPG. HTHP, all directional wells using state of art down hole tools. Deepest well 22,500'. Drilled one well with Noble Max Smith (Semi) with Woodside in 3000' of water to 22,000'. GOM. |
|||
Years | Employer | Title | Department |
Years: 2005 to 2006 | Employer: Petrobras/ Hess | Title: Consultant/ Company Man | Department: |
Responsibilities:Drilled and completed three wells on Diamond Ocean Voyager. Water depth 1400'. Transocean Ocean Marianas (Semi) drilled and completed 2 wells, water depth 4100'. GOM. |
|||
Years | Employer | Title | Department |
Years: 2004 to 2005 | Employer: ENI | Title: Consultant/ Company Man | Department: |
Responsibilities:Drilled and completed one well on Celtic Sea (Semi) in 3500' of water. Jack up work- Ensco 75, 3 wells drilled. Todco 152 two wells drilled. Pride 1501 Platform rig. Completed two work over wells out of eight. Pride Missouri/ Florida drilled 3 wells. Rowan Gorilla drilled and completed one well. Hal Houston Drilled on Roman Ocean Tower two wells. |
|||
Years | Employer | Title | Department |
Years: 2002 to 2004 | Employer: Toolpusher Global | Title: | Department: SantaFe |
Responsibilities:Worked on the Jack Ryan drill ship with drill pie racking system & PRS-4 racking system for derrick. Water depth 4000' to 8500' with 15K Regan & Cameron Bops. Gulf of Mexico, west Coast Africa & Australia. Duties include supervise, monitor and report all rig operations as directed by OIM. Monitor rig operations to insure professional and safe operations of equipment in accordance with operating procedures. Direct facilitation of pre-job planning, risk management, and adherence to safety initiatives. Direct facilitation of rig personals participation in OJT and all required and recommended training. Assist OIM in preparing personnel for positions of increasing responsibility. Responsible for correcting and or reporting any unsafe conditions or act immediately reporting all accidents and incidents to the OIM. Monitor to insure the rig is complaint with all regulatory issues. Responsible for the submission of daily drilling reports. maintain professional relations with company, customer, and 3rd party personnel at all times. Communicate plans, activities, and task respectfully at all times. Assist rig mover and OIM in rig moves and set up on locations. Assist OIM with in facilitating and conducting weekly quality and supervisor meetings to enhance communications. Perform additional duties as directed by OIM. |
|||
Years | Employer | Title | Department |
Years: 1996 to 2002 | Employer: Transocean/ SedcoForex | Title: Driller/ Toolpusher | Department: |
Responsibilities:Worked on Actinia Expert setter type semi in Malaysia. Sedo 601 series semi in Vietnam. Randolp Youst cantilever Jack up in West Africa. Assisted in building the Cajun Express, 5th Generation DP semi in Singapore, towed to Gulf of Mexico and commissioned it for Marathon. Drilled its first hole in 9100' of water with no accidents. |
|||
Years | Employer | Title | Department |
Years: 1990 to 1996 | Employer: ENSCO Drilling | Title: | Department: |
Responsibilities:Drilled on land rigs for 5 years in the Middle East, Syria, Saudi Arabia, Oman, and Bahrain. Box type rigs air over electric. Powered by Diesel Catepillars, type 398 and 399. Drilled most wells from 2900 meters to 3500 meters. Drilled with air, water base and diesel base muds.Drilled in Gulf of Mexico on Ensco 95, cantilever jackup for 2 years. Drilled & completed wells for Conoco. Depth ranged from 11,000' to 17,500'. |
|||
Years | Employer | Title | Department |
Years: 1978 to 1990 | Employer: SEDCO/ SEDCO FOREX | Title: | Department: |
Responsibilities:Started in oilfield as roustabout, and worked way up: roughneck, derrickman, watch stander, assistant Subsea, assistant driller and driller.Worked on Sedco rigs, 135-J &135-k. Sedco 702, 706, 712, & Pentagon 82 all floaters. Towed all these rigs from various places, all back to Gulf of Mexico. Areas worked 135-J East coast US, Baltimore Canyon. Sedco 702 Brazil, Africa Ivory coast and Gulf of Mexico. Sedco 706 Gulf of Mexico, west coast Santa Barbra. Sedoc 712 West coast US. Pentagon 82 Gulf of Mexico. |
Additional Experience
Training / Seminars |
---|
Currently hold Supervisor IADC WELLSHARP Drilling/ Completion/ Workover/ Surface/ Subsea 2019 Valid SWET Helicopter Underwater Egress Training 2018 |